Epoxy Floor Coating

Epoxy Floor Coating is a service offered by Epoxy Garage Floor Kissimmee in Kissimmee, Florida.

Epoxy floor coating refers to a flooring surface created by applying multiple layers of epoxy, a thermosetting polymer, over a concrete substrate. This coating forms a durable, high-performance, and decorative surface that is resistant to stains, abrasions, chemicals, and impact. Its importance lies in its ability to transform ordinary concrete floors into highly functional and aesthetically appealing spaces. Beyond its visual appeal, epoxy floor coating significantly extends the lifespan of concrete by protecting it from daily wear and tear, moisture, and various damaging elements. This makes it an ideal solution for areas requiring robust and easy-to-maintain flooring, such as garages, industrial facilities, commercial kitchens, and showrooms.

What are the projects Epoxy Garage Floor Kissimmee finalized successfully in Kissimmee?

The projects Epoxy Garage Floor Kissimmee finalized successfully in Kissimmee are mentioned below.

Project 1: Residential Garage Transformation for a Homeowner in Celebration

In early June 2025, specifically on June 3rd, Epoxy Garage Floor Kissimmee received a call from a homeowner in Celebration, near the main entrance to Celebration Golf Club. The client, a retired engineer, was looking to transform his 600 sq ft, two-car garage floor. His main problem was the oil stains and cracks that had accumulated over years, making the garage appear neglected and difficult to clean. He wanted a durable, easy-to-maintain, and aesthetically pleasing solution that would also protect his concrete from further damage.

After an initial phone consultation, our team scheduled an on-site visit for June 4th at 10:00 AM. We arrived promptly, performed a thorough inspection, and used a laser measuring tool to confirm the 600 sq ft area, noting several hairline cracks and a few significant oil stains. Based on the client’s desire for durability and a clean look, we recommended our flake epoxy system with a medium broadcast of flakes and a clear topcoat for maximum protection and a slip-resistant finish. The client agreed to the proposal, and we scheduled the work to commence on June 7th.

On June 7th at 8:30 AM, our crew arrived with all necessary equipment. The first step was extensive surface preparation, which involved diamond grinding the entire 600 sq ft floor to achieve a proper profile for adhesion, a process that took approximately 4 hours. We then meticulously repaired the cracks using an epoxy crack filler, which cured within 2 hours. After vacuuming thoroughly to remove all dust, we applied the epoxy primer coat, covering the 600 sq ft area evenly. This cured for 12 hours overnight.

On June 8th at 9:00 AM, we applied the colored epoxy base coat, immediately followed by the broadcast of decorative flakes, ensuring full coverage across the 600 sq ft. This process took about 3 hours. The flakes were allowed to settle for 24 hours.

On June 9th at 10:00 AM, we scraped and vacuumed the excess flakes and applied two layers of clear polyaspartic topcoat for enhanced durability and chemical resistance. Each coat took approximately 2 hours to apply, with a 4-hour recoat window between them. The project was fully completed by 4:00 PM on June 9th, taking a total of 3 days from start to finish.

The client was thoroughly impressed. He stated, “Epoxy Garage Floor Kissimmee truly exceeded my expectations. My garage looks brand new, and the finish is incredibly smooth and easy to clean. It’s a significant improvement to my home.”

Project 2: Commercial Kitchen Flooring for a Restaurant Owner near Old Town Kissimmee

On June 1st, 2025, we received an urgent call from a restaurant owner located just off Irlo Bronson Memorial Highway, very close to Old Town Kissimmee. His commercial kitchen, measuring 1,200 sq ft, had significant issues with its existing vinyl tile flooring – it was peeling, stained, and posed a hygiene risk, failing recent health inspections due to unsealed grout lines. The client, a head chef, needed a seamless, hygienic, and slip-resistant floor that could withstand high foot traffic, spills, and constant cleaning.

We visited the site on June 2nd at 2:00 PM for an assessment. The 1,200 sq ft kitchen presented clear signs of wear and tear, with extensive grease build-up and a strong need for a non-porous solution. We measured the area precisely and proposed a heavy-duty, industrial-grade epoxy system with an anti-slip additive, designed specifically for commercial kitchens, featuring a cove base for easy cleaning and preventing moisture penetration at the wall-to-floor junction. The client approved the same day.

Work commenced on June 5th at 7:00 PM, immediately after the restaurant closed for the day. Our first task was to remove the old vinyl tiles and adhesive, a labor-intensive process that took our team of four approximately 8 hours. We then diamond-ground the 1,200 sq ft concrete slab for proper profiling, followed by extensive cleaning and degreasing, which took another 6 hours. The epoxy primer was applied by 7:00 AM on June 6th.

On June 6th at 6:00 PM, after the primer had cured for the day, we applied the self-leveling epoxy base coat, meticulously ensuring a smooth and even surface across the 1,200 sq ft. This was followed by the application of the anti-slip aggregate while the epoxy was still wet. This phase took approximately 5 hours.

On June 7th at 6:00 PM, we applied the final two coats of clear, chemical-resistant urethane topcoat, incorporating the cove base around the perimeter of the kitchen. Each topcoat application took about 4 hours, with a 6-hour waiting period between coats. The project was completed by 6:00 AM on June 8th, taking a total of 3 nights to minimize disruption to the restaurant’s operations.

The restaurant owner was immensely relieved and happy. He commented, “Epoxy Garage Floor Kissimmee saved my business! The new floor is absolutely perfect – it’s easy to clean, incredibly durable, and our recent health inspection passed with flying colors. I highly recommend them for any commercial flooring needs.”

Project 3: Industrial Warehouse Floor Restoration for a Logistics Company near Osceola Parkway

On May 29th, 2025, a logistics company near the intersection of Osceola Parkway and John Young Parkway contacted Epoxy Garage Floor Kissimmee. Their 5,000 sq ft warehouse floor was severely deteriorated, with numerous cracks, spalling, and dust generation from constant forklift traffic. The operations manager wanted a heavy-duty, impact-resistant, and dust-free flooring solution to improve safety and operational efficiency.

We conducted an on-site evaluation on May 30th at 9:00 AM. The 5,000 sq ft concrete floor showed extensive damage, including deep cracks and potholes. We proposed a robust, 100% solids epoxy mortar system, known for its exceptional strength and ability to withstand extreme industrial conditions, followed by a high-build epoxy topcoat. The plan included significant crack and spall repair. The quote was approved that afternoon.

Work commenced on June 2nd at 7:00 AM. The first day was dedicated to extensive preparation: diamond grinding the entire 5,000 sq ft surface, followed by significant crack and spall repair using an industrial-grade epoxy patching compound. This initial phase took a full 10-hour day with a larger crew to cover the vast area.

On June 3rd at 8:00 AM, we applied the epoxy primer to the entire 5,000 sq ft, ensuring deep penetration into the concrete. This was followed by the application of the epoxy mortar system, hand-troweled to fill imperfections and create a level, incredibly strong base. This intricate process took approximately 9 hours.

On June 4th at 8:00 AM, we applied the high-build epoxy topcoat in two layers, each taking about 6 hours to apply across the 5,000 sq ft, with a 12-hour cure time between coats. The final coat included a non-slip aggregate for safety in high-traffic areas. The project was completed by 8:00 PM on June 5th, taking a total of 4 days.

The operations manager was extremely satisfied. He remarked, “The difference in our warehouse floor is astonishing. It’s incredibly strong, dust-free, and much safer for our employees and equipment. Epoxy Garage Floor Kissimmee delivered a top-tier solution exactly as promised.”

Project 4: Showroom Floor Upgrade for an Auto Dealership near The Loop

On June 6th, 2025, Epoxy Garage Floor Kissimmee was contacted by an auto dealership located near The Loop, seeking an upgrade for their 3,500 sq ft showroom floor. The existing polished concrete had lost its luster and was showing signs of wear, detracting from the presentation of their vehicles. The sales manager wanted a high-gloss, aesthetically pleasing, and durable floor that would enhance the overall customer experience.

Our team visited the dealership on June 7th at 11:00 AM. The 3,500 sq ft showroom, while structurally sound, needed a significant visual uplift. We proposed a metallic epoxy system, offering a unique, marbling effect with a high-gloss finish, which would provide both durability and a striking appearance. The client was enthusiastic about the aesthetic possibilities.

Work began on June 10th at 6:00 PM, after the dealership closed for the day. We meticulously diamond-ground the entire 3,500 sq ft surface to prepare it for the new coating. This took approximately 8 hours. Minor repairs to small chips were also made using a rapid-setting epoxy filler.

On June 11th at 7:00 PM, we applied the black epoxy primer as a base coat, which provided a dark canvas for the metallic pigments. This layer cured overnight.

On June 12th at 8:00 PM, the metallic epoxy was artfully applied over the 3,500 sq ft area. Our skilled technicians carefully manipulated the pigments to create the desired marbling effect, a process that took about 7 hours.

On June 13th at 9:00 PM, we applied two layers of a high-gloss, scratch-resistant polyaspartic topcoat. Each coat took about 5 hours to apply, with a 6-hour recoat period. The project was completed by 8:00 AM on June 14th, taking 4 nights to ensure minimal disruption to business hours.

The sales manager was delighted with the outcome. He commented, “Our showroom now looks absolutely stunning! The metallic epoxy floor truly elevates the space and makes our cars stand out. We’ve already received numerous compliments from customers. Epoxy Garage Floor Kissimmee’s craftsmanship is exceptional.”

Project 5: Home Gym Flooring Installation for a Fitness Enthusiast in Hunters Creek

On May 28th, 2025, a fitness enthusiast residing in Hunters Creek, specifically near the Falcon Trace community pool, contacted Epoxy Garage Floor Kissimmee. He wanted to convert a 450 sq ft section of his garage into a dedicated home gym. His problem was the cold, dusty concrete floor that offered no impact absorption for heavy weights and was difficult to keep clean. He desired a durable, easy-to-clean, and shock-absorbent flooring solution.

Our team visited on May 29th at 1:00 PM. The 450 sq ft area was clearly defined. We recommended a 100% solids epoxy system with a thicker build, incorporating rubberized flakes for added cushioning and slip resistance, finished with a robust clear topcoat. This would provide the necessary durability for weights and exercise equipment. The client approved the same day.

Work commenced on June 1st at 9:00 AM. The first step was diamond grinding the 450 sq ft concrete surface to ensure optimal adhesion, which took approximately 3 hours. Following this, we meticulously cleaned and vacuumed the area. The epoxy primer was applied, curing for 12 hours.

On June 2nd at 9:00 AM, we applied the colored epoxy base coat, covering the 450 sq ft area. Immediately after, we broadcast the rubberized flakes generously to provide cushioning and texture. This took about 2 hours.

On June 3rd at 10:00 AM, after the flakes had settled and excess removed, we applied two layers of a high-wear, clear polyaspartic topcoat. Each application took about 1.5 hours, with a 4-hour recoat window. The project was fully completed by 3:00 PM on June 3rd, taking a total of 3 days.

The client was extremely pleased with his new home gym floor. He exclaimed, “This is exactly what I envisioned! The floor is perfect for my workouts – it’s durable, comfortable, and looks fantastic. No more dust, and it’s so easy to wipe down. Epoxy Garage Floor Kissimmee truly delivered a premium product.”